EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
EaglesWing
-
Listing for Category : workshop
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (363)
Drawings
- (1)
Workshop
- (21)
Supplies
- (24)
Tools
- (21)
Rudder
- (19)
Tail
- (79)
Slats/Flaps
- (60)
Wings
- (86)
Fuel System
- (14)
Lighting
- (33)
-
Purchased Screws,...
-
R/H Wing Recognition...
-
R/H Recognition Light
-
R/H and L/H Position...
-
R/H Taxi/Recognition...
-
R/H Taxi/...
-
R/H Taxi/Recognition...
-
R/H Taxi/Recognition...
-
Purchased #8 dimpled...
-
L/H Taxi/Recognition...
-
L/H Taxi/Recognition...
-
Taxi/ Recognition...
-
Purchased Screws P/N...
-
L/H Taxi/...
-
Taxi/Recognition Lights
-
Picked up LED...
-
Purchased LED...
-
Purchased 2 each...
-
Purchased MS21049L08...
-
Rudder Tail Light...
-
Installed riv-nuts...
-
Purchased Rivet Nuts
-
Drilled tail light...
-
Tail light wiring
-
Tail light cut out
-
Purchased 4-way...
-
Tail light bracket
-
Purchased butt splices
-
Purchased 1/8"...
-
Purchased Rubber...
-
Purchased 12V LED...
-
Purchased tail light...
-
Purchased wire for...
Fuselage
Landing Gear
Controls
Instrument Panel
- (2)
Avionics
Engine
Firewall
Propeller
Interior Finish
Paint / Decals
- (3)
Inspection
Builder Name:
Todd Luebstorf
-
Project:
Zenith CH750SD
-
VIEW REPORTS
Total Hours:
496.7
Total Flight Time:
Start/Last Date:
Dec 12, 2019 - No Finish Date
Engine:
Viking 195
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=EaglesWing
Home or Last Project Picture
Jun 19, 2022
Built paint rack
- (1.0 hour)
Category: Workshop
Built a 10' x 6' x 3/4” PVC rack for hanging parts to paint.
13521F2C-DB3D-4199-BA30-03783BF6CDFA.jpeg
Jun 04, 2022
Installed new air system
- (8.0 hours)
Category: Workshop
Installed the Rapid Air master system from my shop to the garage. Also installed the new air filters. Planning to set up a movable paint booth made from a 10'x20' canopy tent with a screen kit on it.
715F26D6-448D-4484-A303-AC3A5C1FE675.jpeg
F3B44719-7EBF-45E1-8A42-FCA24F289C45.jpeg
E458C9D0-8173-43EE-A860-B872CBFCFAE1.jpeg
9989C5C9-351E-4909-AD42-396CF85222B7.jpeg
79D78520-6A17-45A3-86EE-2EF677FC2B9D.jpeg
May 30, 2022
Purchased Canopy and Screen Kit
Category: Workshop
Purchased a 10'x20' canopy and screen kit from Menards. Planning on making this into a paint booth.
71AB90DB-F7E0-43E6-B506-C1F75EB6E450.jpeg
May 12, 2022
Purchased S hooks
Category: Workshop
Purchased Gray Bunny S hooks, 3.5” long, from Amazon for hanging parts to paint. Bought 2 packs of 20.
9D6A993C-CC68-4696-A22A-BF9B95CBD711.jpeg
May 07, 2022
Purchased PVC pipe and fittings
Category: Workshop
Purchased 3/4” PVC pipe and fittings to make a paint rack from Menards.
Apr 18, 2022
Purchased Rapid Air Master Kit and associated parts
Category: Workshop
Purchased a Rapid Air master kit, air fittings and hose holder from Northern Tool ($218.25), Home Depot ($32.81), and Menards ($9.99).
Apr 17, 2022
Purchased Air Filter
Category: Workshop
Purchased a Rapid air filter Regulator, Eastwood Air CFS, and DVB QC3 Air Filter Desiccant Cartridge. Needed a new filter in the shop and I'm going to run an air line up to the garage.
Jan 10, 2022
Purchased additional brackets
Category: Workshop
Purchased some more brackets for the wall shelf to hold slats and flaperon parts.
2B7B8F1B-8B28-40EA-AAFE-4CB4C81BD4AC.jpeg
Dec 11, 2021
Purchased Storage Shelving
- (1 hour)
Category: Workshop
Purchased some hanging shelving and pipe insulation to hold the horizontal stabilizer and elevator. Put together and hung on the wall.
EADE2112-4FE7-4C1D-85D7-4EC835486D8E.jpeg
1C54AD03-5BA4-489B-9F7D-F8553CDA30F5.jpeg
Dec 04, 2021
Wood beam
- (.8 hour)
Category: Workshop
Found a piece of 2x6, cut 2 each 2 foot pieces and glued a piece of rubber to one side. I'll use these to set the elevator on so I can install the horns.
230D38EF-99E1-4031-B9AB-461FDC7F5BE2.jpeg
Mar 09, 2020
Purchased 2"X2" Aluminum Tubing
Category: Workshop
Purchased 2 each of 2"X2"X4' Aluminum tubing from Wicks. These will be used to put the rudder on as I'm assembling it so it's not resting on the rivets. This square tubing will also keep the rudder straight.
Feb 24, 2020
Work bench total cost
Category: Workshop
The total cost to build the 4' x 12' work bench was $256.32.
Feb 24, 2020
Work Bench
- (1.1 hours)
Category: Workshop
Cut and screwed the 8' bottom shelf piece. Work Bench is done.
A1E78325-FD5A-46AA-A041-B0F89ACF97B6.jpeg
Feb 10, 2020
Work Bench
- (1.7 hours)
Category: Workshop
Cut and installed the bottom shelf 2x4's. Cut the 4' bottom to fit around the legs.
6E445900-1DDB-4E2D-9A9E-C108009E0766.jpeg
C63E068F-D26A-4C65-9A8B-D0859ED0AB08.jpeg
Feb 01, 2020
Work Bench
- (1 hour)
Category: Workshop
Sanded and painted the top.
103C315C-568D-442F-891D-D633B26B1A65.jpeg
Jan 30, 2020
Work Bench
- (1.2 hours)
Category: Workshop
Sanded and painted the top.
9AD88FFF-5EF4-4247-8C52-9BD5B5FA944C.jpeg
Jan 28, 2020
Work Bench
- (1.0 hour)
Category: Workshop
Flipped the work bench over and primed the top. I'm having to prime and paint the top because I used OSB subfloor.
B6DD376A-12C0-4579-9F7B-F4413487738A.jpeg
B8BE2B67-0389-4570-B0FC-41679F1A58E3.jpeg
FF5A969E-A483-4ADB-80F3-4269F374B9A9.jpeg
Jan 25, 2020
Work Bench
- (5.0 hours)
Category: Workshop
Finished legs and finished screwing the top op. Installed the bottom supports.
01E714D9-B4B0-47C3-B49D-C2C3E8B45903.jpeg
Jan 24, 2020
Work Bench
- (4.0 hours)
Category: Workshop
Nailed the legs together and installed them. Also assembled the bottom shelf.
82082F47-5E6C-44DA-860E-5292EDEF439E.jpeg
Jan 23, 2020
Work Bench
- (2.0 hours)
Category: Workshop
Screwed the top together.
B3E438D9-74F0-49A4-A4FF-3072BDAABE15.jpeg
Jan 20, 2020
Work Bench
- (3.0 hours)
Category: Workshop
Cut the wood to size. Building a 4' x 12' work bench.
0FBF9BCD-CFE6-44B1-BDC7-17F5F81DE6A5.jpeg
78D0EF9F-5B01-418A-83F2-DF642201A31B.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.